Ensures high reliability and safety, bolstered by its robust anchorage system.
With a single crane lift, the entire MINGLEI climbing formwork system can efficiently advance to the next pouring height.
Delivers a rapid pouring cycle for vertical structures, eliminating the need to ascend with horizontal construction.
Compatible with various MINGLEI wall formwork systems.
This climbing cone formwork features a 3-5 platform design, facilitating a more convenient and efficient workflow for construction projects.
A spacious main platform, measuring up to 2.4 meters, offers ample space for workers to operate comfortably and safely.
The climbing formwork panel can be retracted by up to 750 millimeters, providing easy access for cleaning and maintenance on the scaffolding and shuttering.
The climbing formwork system permits a substantial pouring height of up to 4.5 meters for each cycle, enhancing the overall construction pace.
High rise buildings, bridge piers, water tanks, LNG tanks etc.